Submit for the final overhead calculation (for classic Calculation only)

Push your manufacturing scenarios into the project calculation and assign them to sourcing scenarios and batch sizes.

Written by Fabian Heldt

Note on feature deprecation
​
This step is only required for the classic Calculation, and not Flexible Calculation. It will be removed when the classic Calculation module is deprecated in early November 2026. To move to Flexible Calculation, see Flexible calculation.

When your manufacturing calculation looks right, submit it so its costs flow into the final overhead calculation alongside sourcing.

Submit for calculation

With your manufacturing scenarios ready, click Submit for calculation in the top right.

Assign scenarios and batch sizes

You can now assign one manufacturing scenario and a batch size to every sourcing scenario. Pick multiple batch sizes per scenario if you want the overhead calculation to compare options.

If you didn't link a manufacturing scenario to a sourcing scenario earlier, you can submit a single manufacturing scenario for all sourcing scenarios.

What happens next

The manufacturing cost is now part of the project's overall calculation. To learn how the roll-up (markup, NRE, shipping) works, see Complete your overhead cost calculation.